Viking Athletic Field Renovation
Sandblasted engraving project as part of La Jolla High School's 2016 renovation. Contractor requested that we relocate a 16 year old donor memorial into an existing concrete wall. Replica engraving was completed within a couple days and ready for concrete pour. Engraving was completed at 1/8th inch depth and filled with a durable, UV, dirt resistant matte black paint.
La Jolla High School Existing Wall Concrete Engraving
Sandblasted engraving project as part of La Jolla High School's 2016 renovation. Contractor requested that we relocate a 16 year old donor memorial engraving into an existing concrete wall. Replica engraving was completed within a couple days and ready for concrete pour. Engraving was completed at 1/8th inch depth and filled with a durable, UV, dirt resistant matte black paint.